Solar power and storage prices have dropped almost 90%::undefined

    • chiliedogg@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      ·
      1 year ago

      As the guy in charge of the red tape - there really isn’t much.

      Show that it’s designed to be safely installed on the roof and that you have a licensed electrician doing the install.

      Then submit to an inspection.

      It takes 15 minutes to get a solar permit, and the whole thing videos like $250 in permitting - most of which is inspections.

      But the contractor invoices $3,000 for permitting, so of course they’re gonna say there’s a bunch of red tape to justify it.

      • vagrantprodigy@lemmy.whynotdrs.org
        link
        fedilink
        English
        arrow-up
        2
        ·
        1 year ago

        Mine took weeks to get an inspector out, and the local permitting fees were thousands (yes, I called the city and county to verify). Then the utility apparently required their own inspection, which took another month, because their guys kept no-showing.