You must log in or # to comment.
About time. That’ll have been 212 days. More than 7 months since BCC’s poor maintenance led to it being shut for safety. 7 months where BCC failed to provide adequate detour.
The Lord Mayor and Cr Murphy must be bitterly disappointed there wasn’t a severe crash during that time.