• entropicdrift@lemmy.sdf.org
    link
    fedilink
    arrow-up
    4
    ·
    2 days ago

    The 4.1m was the budget for the front-end. The back-end changes were initially budgeted as 31m but tripled in cost as the project dragged on and contracts needed to be extended.